Eppcraft

Universal Machine Fit

Machine-Compatible Molds for Kurtz, Erlenbach & Fangyuan

Every mold is verified against your machine platen layout before machining starts. No surprise fitment issues at commissioning.

Request DFM Review

4 Brands

Machine Compatibility

15-Point

DFM Machine Check

Staubli

Standard Fittings

25–40 Days

Lead Time

Machine-compatible mold engineering

Verified Fit Before a Single Cut Is Made

Fitment failures at commissioning cost time and money. Our 15-point DFM machine check maps platen bolt patterns, steam port positions, fill gun geometry, and mold weight limits against your exact machine model before machining begins.

We hold certified platen drawings for Kurtz, Erlenbach, Fangyuan, and Teubert machines. If your machine is not on the list, send us the platen drawing and we add it to our database at no charge.

  • Kurtz, Erlenbach, Fangyuan, and Teubert platen drawings on file
  • Staubli quick-connect fittings on all steam/water/air lines
  • Platen bolt pattern verified before mold design is finalized
  • Machine interface dimensions annotated on final drawing
  • No adapter plates, no machine-side modifications required

Mold Details

Kurtz machine interface verification

Kurtz machine interface verification

Platen dimension mapping

Platen dimension mapping

Steam port layout verification

Steam port layout verification

Technical Specifications

Compatible brands Kurtz · Erlenbach · Fangyuan · Teubert · Any brand with spec sheet
DFM check points 15-point machine interface verification
Fittings standard Staubli quick-connect (steam / water / air)
Platen mapping Bolt pattern, T-slot, steam port, fill gun geometry
Lead time 25–40 days from approved DFM
Documentation Machine-interface drawing included in 5-document package

5 Documents Included with Every Mold

  1. 1 DFM Analysis Report — draft angles, wall thickness, fill-gun layout
  2. 2 Shrinkage Calculation Sheet — EPP grade vs. compensated dimension table
  3. 3 Steam Port Mapping — diagram of all inlet, outlet, and drain positions
  4. 4 Test-Shot Data Sheet — first-article dimensions vs. nominal, signed off
  5. 5 Final Inspection Report — CMM measurement report with traceable calibration

Have a machine compatibility question?

Send your machine model number. We check our library and respond within 24 hours.

Request Free DFM Review